Operating Procedures for Core-Making Machines

Aug 20, 2026

Leave a message

Before operating the core assembly machine, inspect all equipment components to ensure they are in proper working order; verify that the power supply, air supply, and connections are normal; and keep the surrounding area tidy to prevent debris from interfering with operations. Prior to startup, ensure the core, tooling, and positioning components are correctly installed and verify equipment parameters against production requirements; do not alter settings without authorization.

 

Operate the equipment according to established procedures, maintaining full attention on the machine's operation and the product processing status. Follow required protocols for loading, unloading, adjusting, and replacing cores; strictly prohibit reaching into hazardous areas while the machine is running. If any abnormalities regarding product dimensions, positioning, or processing status are detected during production, halt operations immediately to investigate.

 

In the event of material jams, unusual noises, alarms, or other anomalies during operation, stop the machine immediately and identify the cause before taking corrective action. Before entering the machine for inspection or maintenance, disconnect the power and other energy sources, and ensure the machine has come to a complete stop. Promptly notify maintenance personnel of issues that cannot be resolved independently; unauthorized disassembly or forced startup of the machine is strictly prohibited.

 

Shut down the machine and associated power sources in the prescribed sequence; clean away residual material, oil, and debris; and check the condition of the core, tooling, and machine. Maintain cleanliness of the equipment and workspace, ensuring no safety hazards remain before leaving; complete equipment operation and production logs as required to prepare for the next shift.

Send Inquiry